FPSO Anita Garibaldi – MV33 Spread Mooring System
Scope of Work
SOFEC is responsible for the design and procurement of a spread mooring system for the FPSO Anita Garibaldi – MV33 which will be deployed at the Marlim Field in the Campos Basin, in the northern region of the Rio de Janeiro State, 150 km off the coast.
The FPSO will be capable of processing 80,000 barrels of crude oil per day, 247 million standard cubic feet of gas per day, 390,000 barrels of water injection per day and has a minimum storage capacity of 1,400,000 barrels of crude oil.
The FPSO will be able to accommodate a total of 59 flexible risers and umbilicals.
The SOFEC spread mooring system will be ABS classed.
General Description
Client Name: | Petróleo Brasileiro S.A. (Petrobras) |
Contract Award: | October 2019 |
Installation Date: | Planned for 2022 |
First Oil: | Planned for 2022 |
Vessel Size: | 300,000 dwt |
Storage Capacity: | 1,000,000 bbls |
Water Depth: | 670 m (2,198 ft) |
Design Environmental Criteria
100-year storm
Sig. Wave Height: | 7.85 m (25.76 ft) |
Wind Velocity: | 31.38 m/s (61.00 kts) |
Current: | 1.87 m/s (3.63 kts) |
Riser System
17 Oil Production Risers
17 Gas lift / Service Risers
6 Water Injection Risers
1 Gas Import / Export Riser
16 Control Umbilical
1 SESDV Control Umbilical
1 Fiber Optic Cable