Project Type: CALM Buoys

In December of 2002 SOFEC was awarded design, supply and installation of five offshore loading stations for transportation of crude oil and condensate from onshore facilities for Sonatrach TRC, the Oil and Gas Company, in Algeria.

In December of 2002 SOFEC was awarded design, supply and installation of five offshore loading stations for transportation of crude oil and condensate from onshore facilities for Sonatrach TRC, the Oil and Gas Company, in Algeria.

In December of 2002 SOFEC was awarded design, supply and installation of five offshore loading stations for transportation of crude oil and condensate from onshore facilities for Sonatrach TRC, the Oil and Gas Company, in Algeria.

SOFEC designed and supplied two CALM Buoy systems for the OCP pipeline project in Ecuador.

SOFEC designed and supplied two CALM Buoy systems for the OCP pipeline project in Ecuador.

SOFEC designed, constructed, and installed a CALM Buoy system for the SHELL Malampaya Deep Water Gas to Power project.

SOFEC designed, constructed, and installed a CALM Buoy system to accommodate up to 450,000 dwt tankers.

SOFEC supplied a 12.5m diameter CALM buoy from its stock buoy program to replace a non-SOFECĀ® buoy that had experienced premature failure in service.

Designed, constructed and installed a replacement CALM system to accommodate 35,000 to 85,000 dwt tankers in 20m water depth. The system is linked via four 18-in. pipelines to a refinery located two miles away.

SOFEC designed and constructed a CALM system located in 25m water depth to export diluted or refined crude oil and gas oil products to the 96,920 dwt tanker and import naphtha diluent from tankers to shore.