Mooring Systems
 Marine Terminals
 Swivel Systems
 Aftermarket Support
 Engineering
 Project Management
 First Oil



 CALM Buoys
 SALM Buoys

 Go Back

Marine Terminals - CALM Buoys

Mina al Ahmadi #1 and #2 CALMs - Kuwait

SOFEC designed, constructed, and installed two CALM systems for National Petroleum Construction Company (NPCC) to accommodate up to 456,000 dwt tankers.

Each unit is equipped with a sophisticated SCADA system for remote monitoring and control. The floating hose system consists of two 24-in. lines each with twin 16-in. tail hoses and a 12-in. bunker line.

General Description
Location: Mina al Ahmadi, Kuwait
Client Name: Kuwait Oil Company (KOC)
Contract Awarded: May  1995
Installation Date: January 1996
Application: Crude Oil Export and Bunkering
Water Depth: 31m (100ft)
Tanker Size: Up to 456,000 dwt
Region: Middle East
 
Printer Friendly Version



Design Data Form Buoys