Marine Terminals - CALM Buoys

Jebel Dhanna #2 CALM - United Arab Emirates

SOFEC designed, constructed, and installed a CALM Buoy system to accommodate up to 450,000 dwt tankers.

This export CALM system was installed in 23m water depth. This includes extension of the existing 36-in. sealines and removal of two existing CBM. This is the fourth project in which SOFEC has been involved in the replacement of a CBM system with a more efficient SPM system and the second for ADCO.

General Description
Location: Jebel Dhanna, United Arab Emirates
Client Name: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Contract Awarded: October  1998
Installation Date: July 1999
Application: Crude Oil Export
Water Depth: 23m (60ft)
Tanker Size: 450,000 dwt
Region: Middle East
 