Mooring Systems
 Marine Terminals
 Swivel Systems
 Aftermarket Support
 Engineering
 Project Management



 CALM Buoys
 SALM Buoys

 Go Back

Marine Terminals - CALM Buoys

Jebel Dhanna #1 CALM - United Arab Emirates

SOFEC designed, constructed, and installed a CALM Buoy system to accommodate up to 450,000 dwt tankers.

This SOFEC designed export CALM system was installed in 21m water depth. This included an extension of the existing 42-in. sealine and removal of the existing CBM. This was the third project in which SOFEC was involved in the replacement of a CBM system with a more efficient SPM system.

General Description
Location: Jebel Dhanna, United Arab Emirates
Client Name: Abu Dhabi Company for Onshore Oil Operations (ADCO)
Contract Awarded: March  1995
Installation Date: December 1995
Application: Crude Oil Export
Water Depth: 21m (67ft)
Tanker Size: 450,000 dwt
Region: Middle East
 
Download Data Sheet For Marine Terminals
Printer Friendly Version



Design Data Form Buoys


Marine Terminals Brochure