SOFEC was responsible for the design and analysis of the Kizomba B FPSO mooring system. The supply of the off-vessel equipment (wire, chain, piles) as well as the installation of the system was once again the responsibility of the EPC3 installation contractor. The SOFEC mooring system is DnV classed.
General Description