A SOFEC external turret mooring system will be designed, constructed and supplied for the MODEC new purpose-built 45,000 dwt FSO in the Rong Doi and Rong Doi Tay oil fields, located in 320 km southeast of Vung Tau on Block 11-2 of the Nam Con Son Basin, Vietnam.
Condensate processed at the Rong Doi Platforms will be loaded to the FSO via flexible riser. The FSO will be installed in 85m (278ft) water depth.
General Description