SOFEC designed and constructed the external turret mooring system to moor a 149,500 dwt MODEC purpose built FPSO. The FPSO will recieve producted oil and reinject both produced gas and water. The turret is designed to support a single production platform in Phase I, with space to accept additional production from a second future production platform in Phase II of the project.
General Description