About SOFEC

Marine Terminals

Mooring Systems

New Technology

Riser Systems

Swivel Systems

System Solutions
Mooring Systems Specialists » Marine Terminals » CALM Buoys »
Petronas Carigali - Malaysia - Terengganu #2 CALM

SOFEC designed, constructed and installed a replacement CALM system to accommodate 35,000 to 85,000 dwt tankers in 20m water depth. The system is linked via four 18-in. pipelines to a refinery located two miles away.

In 1982, SOFEC designed, constructed, and installed a multi product import/ export CALM system for Petronas. SOFEC removed the existing system and installed a replacement CALM plus 55m of chain per leg. This system uses a relatively small main bearing and three heavy outboard turntable rollers running on a replaceable crane rail track.

The CALM buoy itself features six self-aligning chain stoppers, vertical pull hawse pipes, six watertight compartments, and closed centerwell. The buoy deck is equipped with a quick disconnect manifold for manual operation of the hydraulic system for control of underwater PLEM ball valves.

The Terengganu CALM is a low maintenance design with fully sealed rotating components that require minimal lubrication and can be replaced without removing the turntable. All components are designed to allow full field servicing.

General Description

Location: 

Kerteh, West Malaysia

Client Name:

Petronas Carigali

Contract Award:    

April 1998

Installation Date:

April 1999

Application:

Multi Product Import and Export

Project Specifications

Water Depth:   

20m (65ft)

Tanker Size:

85,000 dwt

Region:

Asia Pacific

 Contact Us
 Career Center
 News Room
 Sitemap
WWW.SOFEC.COM LEGAL NOTICE