SOFEC designed, constructed, and installed two CALM systems for National Petroleum Construction Company (NPCC) to accommodate up to 456,000 dwt tankers.
Each unit is equipped with a sophisticated SCADA system for remote monitoring and control. The floating hose system consists of two 24-in. lines each with twin 16-in. tail hoses and a 12-in. bunker line.
General Description
Location:
Mina al Ahmadi, Kuwait
Client Name:
Kuwait Oil Company
Contract Award:
May 1995
Installation Date:
January 1996
Application:
Crude Oil Export and Bunkering
Project Specifications
Water Depth:
31m (100ft)
Tanker Size:
Up to 456,000 dwt
Region:
Middle East / India