About SOFEC

Marine Terminals

Mooring Systems

New Technology

Riser Systems

Swivel Systems

System Solutions
Floating Systems » Marine Terminals » CALM Buoys »
CBI - N America - St. Eustatius CALM

SOFEC designed, constructed, and installed a CALM system for crude oil import and product export as part of a trans-shipment terminal facility. St. Eustatius is in the Leeward Islands in the Netherland Antilles approximately 190 miles ESE of Puerto Rico.

As a partnering arrangement with Chicago Bridge and Iron (CBI), the parent of Statia Terminals, and Brown and Root, SOFEC designed, constructed and installed a dual product CALM system in 65m water depth. The system is designed to survive hurricane conditions and moor tankers up to 520,000 dwt in the operational conditions. It is equipped with a sophisticated SCADA system for remote load monitoring, valve control, leak detection, operating pressure monitoring and battery status. The crude is shipped through a 48-in. subsea pipeline to a temporary storage at a Statia tank farm, from where it is then re-loaded onto smaller tankers for delivery to Gulf of Mexico refineries.

General Description

Location: 

St. Eustatius, Leeward Islands, Netherland Antilles

Client Name:

Chicago Bridge and Iron (CBI)/Statia Terminals

Contract Award:    

October 1993

Installation Date:

September 1994

Application:

Crude Oil Import / Product Export Trans-shipment Facility 

Project Specifications

Water Depth:   

65m (212ft)

Tanker Size:

520,000 dwt

Region:

North America

 Contact Us
 Career Center
 News Room
 Sitemap
WWW.SOFEC.COM LEGAL NOTICE