About SOFEC

Marine Terminals

Mooring Systems

New Technology

Riser Systems

Swivel Systems

System Solutions
Mooring Systems Specialists » Marine Terminals » CALM Buoys »
ADMA OPCO - U.A.E.CALM

SOFEC designed, constructed, and installed a CALM terminal for crude oil exports at the Tanker Berth No. 3, Das Island, Abu Dhabi, United Arab Emirates.

This single product CALM is installed in 31m water depth. The ADMA-OPCO CALM features a double hull design that eliminates potential repair problems associated with foam filled compart-ments. Six 3.75-in. chain legs anchor the 12.5m diameter CALM.

The fluid swivel incorporates an electrical swivel, which relays SCADA signals to the internal accumulator powered hydraulic valve control system that permits the PLEM valves to be remotely operated. The CALM is equipped with a load monitoring system and dual 20-in. double carcass hoses.

General Description

Location: 

Das Island, Abu Dhabi, U.A.E.   

Client Name:

Abu Dhabi Marine Operating Co. (ADMA/OPCO)

Contract Award:    

November 1990 

Installation Date:

August 1991

Application:

Diesel, Gasoil, Naphtha Import

Project Specifications

Water Depth:   

28m (92ft)

Tanker Size:

500,000 dwt

Region:

Middle East / India

 Contact Us
 Career Center
 News Room
 Sitemap
WWW.SOFEC.COM LEGAL NOTICE