SOFEC designed, constructed, and installed a CALM Buoy system to accommodate up to 450,000 dwt tankers.
This export CALM system was installed in 23m water depth. This includes extension of the existing 36-in. sealines and removal of two existing CBM. This is the fourth project in which SOFEC has been involved in the replacement of a CBM system with a more efficient SPM system and the second for ADCO.
General Description
Location:
Jebel Dhanna, Abu Dhabi, U.A.E.
Client Name:
Abu Dhabi Company for Onshore Oil Operations (ADCO)
Contract Award:
October 1998
Installation Date:
July 1999
Application:
Crude Oil Export
Project Specifications
Water Depth:
23m (60ft)
Tanker Size:
450,000 dwt
Region:
Middle East / India